SRCC Downloads

SRCC reports are available below by collector model number and description. They are standard .pdf formats.

47mm x 1500mm 20 tuber *** THIS CERTIFICATION IS NO LONGER ACTIVE
This certification is no longer active and is for engineering reference only!!
FC4715-20D.pdf
Adobe Acrobat document [738.6 KB]
47mm x 1500mm 30 tuber*** THIS CERTIFICATION IS NO LONGER ACTIVE
This certification is no longer active and is for engineering reference only!!
FC4715-30D.pdf
Adobe Acrobat document [738.6 KB]
58mm x 1800mm 15 tuber
This is the standard larger 58mm x 1800mm 15 tube double wall model with stainless steel shell. It is approximately 4 feet wide by 6-1/2 feet tall.
FC5818-15D.pdf
Adobe Acrobat document [738.2 KB]
58mm x 1800mm 18 tuber
This is the standard larger 58mm x 1800mm 18 tube double wall model with stainless steel shell. It is approximately 4-1/2 feet wide by 6-1/2 feet tall.
FC5818-18D.pdf
Adobe Acrobat document [738.2 KB]
58mm x 1800mm 20 tuber
This is the standard larger 58mm x 1800mm 20 tube double wall model with stainless steel shell. It is approximately 5 feet wide by 6-1/2 feet tall.
FC5818-20D.pdf
Adobe Acrobat document [738.2 KB]
58mm x 1800mm 22 tuber
This is the standard larger 58mm x 1800mm 22 tube double wall model with stainless steel shell. It is approximately 5-3/4 feet wide by 6-1/2 feet tall.
FC5818-22D.pdf
Adobe Acrobat document [802.0 KB]
58mm x 1800mm 24 tuber
This is the standard larger 58mm x 1800mm 24 tube double wall model with stainless steel shell. It is approximately 6 feet wide by 6-1/2 feet tall.
FC5818-24D.pdf
Adobe Acrobat document [802.0 KB]
58mm x 1800mm 30 tuber
This is the standard larger 58mm x 1800mm 20 tube double wall model with stainless steel shell. It is approximately 8 feet wide by 6-1/2 feet tall.
FC5818-30D.pdf
Adobe Acrobat document [738.2 KB]

Where to Find Us:

www.WeAreSolar.com (Fitch Consulting)
1072 Fowlersville Rd

Berwick, PA 18603


Phone: 570-752-4827

Email: fcfcfc@pa.metrocast.net

 

Domains for SALE:

www.itsintheroof.com

www.itsontheroof.com

 

www.sedo.com    buy/sell domain

What's New

Bumper sticker !!!

 

2017 PV production is 14.293 MWH.

2016 PV production is 15.629 MWH.

2015 PV production is 14.543 MWH.

2014 PV production is 7.711 MWH, first year partial production. 9.374 MWH were produced through the entire startup test phase of the system before certification.

 

2017 production down 1.34 MWH from last year. All months produced less except for December which is the cloudiest month of the year.... Ironic...

 

Electric car miles for the third year are 13,220 saving 575 gallons of gas at an avoided cost of $1955.00 bringing the three year total to $5225.00. Gas prices steadily climbed throughout the year. Total number of gallons not used stands at 1790.

 

Electric car miles for the second year are 14,830 saving 645 gallons of gas at an avoided cost of $1870.00 bringing the two year total to $3270.00. Not bad for only 2 years at fairly low gas prices...

 

Electric car miles for the first year ran about 13,000 miles of energy free driving. The gas saved which would have been burned by the car that the Leaf replaced equals about 570 gallons at an avoided gas cost of $1400.00.

 

Total mileage across the three years equals 41,050 miles. At a gross electric usage of 3 miles per KWH year round, this translates to 13.68 Megawatt hours of electricity, or 4.56 Megawatt hours per year. With the addition of the Ford C-Max plug-in Hybrid over the last year, the total transportation electric load is increased by about 2 megawatt hours more, bringing the household trans electric yearly load to about 6.6 megawatt hours.